Menu

Eaves And Verge

Joints at eaves and verge edges should provide a secure, wind tight termination for the roof, but be capable of accommodating the thermal movement of the panels without overstressing the metal.

Expansion provision must be made at eaves and verge edges and at the joints.

 

 

 

 

 

Clause: 
015_004_009_003_000_000_000_000_000
Clause Number: 
15.4.9.3
/cop/other-products/standing-seam-cladding#eaves-and-verge
Revision Category: 
0 - Clause Removed
Revision Detail: 

Clause removed during a comprehensive revision of Standing Seam Cladding.

Draft Clause: 
014_004_009_003_000_000_000_000_000