Menu

Flashing Metal Tile to Wall

The wall cladding flashings must be positioned before the tiles and must be designed so that the turned up tile can be inserted behind the flashing.
All preparatory work of under-flashing, fixing of eaves, gutters and valley gutters must be completed, and all tiling battens must be in place before laying tiles.

 

 

 

 

 

 

 

Clause: 
015_003_005_004_000_000_000_000_000
Clause Number: 
15.3.5.4
/cop/other-products/pressed-metal-tiles#flashing-metal-tile-wall
Draft Clause: 
014_003_005_004_000_000_000_000_000